Applications
For HVAC condenser water and process cooling. Confirm circuit type, operating load and installation location.
Sizing inputs and handover
- Thermal duty
- Provide circulation flow (m³/h), entering and leaving water temperatures (°C), design wet-bulb temperature (°C) and the load range.
- Location and connections
- Check envelope dimensions, operating weight, foundations, airflow, noise, makeup, blowdown and service clearance.
- Selection and handover
- Compare manufacturer thermal data at the same duty. Confirm motor power, connection sizes and the field verification method.
Applicable standards
Use the applicable part of GB/T 7190 for small and medium open, large open, or closed towers.
Prepare your project information
Describe the location, intended use and available installation space. Have drawings or photos ready for the discussion.
