Solutions

Building water supply and pressure zoning

Check peak flow, required terminal pressure and the duty and standby conditions in each pressure zone.

Building water supply and pressure zoning
Illustrative scene

Project preparation

Inputs
Combine static lift, terminal pressure, pipe and fitting losses, allowing for available inlet pressure.
Coordination
Plot normal and peak duty on the pump curve. Check operating range, input power and suction conditions.
Handover
Record water temperature and inlet pressure. For sewage pumps, add solids, fibres, sump levels and lifting access.