Checks during assembly
Lanbo’s files include a photograph of a black modular tank being assembled outdoors. For a buried installation, confirm ground and foundation conditions, flotation design, access openings and drainage before site work. Use the project and equipment drawings for the specified structure and materials.
Keep records before concealment
Record assembly sections, connections, protective details and checks before they are concealed, as the project requires. File photographs with the equipment number, drawing revision and inspection date so later maintenance can locate pipework and access points. The photograph records the assembly stage.