Gather plant room dimensions, building axes and clearances on a base drawing. Distinguish walls, doors, beams and existing equipment. Mark which dimensions came from building plans and which were measured on site.
Add the tank, nozzles and installation route after reviewing the base drawing. Flag dimensions that must still be checked before they become equipment inputs.
