After revising a tank drawing, record the sheet and revision, affected panels, dimensions and nozzles, and the people informed. If fabrication has started, identify parts requiring rechecking.
Use one revision for the PDF, DWG, material list and affected site sheets. File review responses with that change so the version in use can be traced.
