Measure the full delivery route
Walk the route from unloading to the plant room. Record actual clear dimensions at doors, lifts, landings, turns and overhead pipework, and note movable obstacles. A single plan can show removal of the old equipment, delivery of the new panels and their final location.
Coordinate access with the outage
Before materials arrive, confirm working hours, temporary storage and water interruptions with the operator. If part of the supply must stay available, plan temporary supply and confirm the conditions for restoration. Route photographs and the narrowest measured clearances are useful with a Lanbo inquiry.