The company records show an April 28, 2025 update listing intelligent water systems development. On a project, this can be discussed in terms of monitoring points, operating status, alarms and logs.
Start with the operator’s actual control needs. Specify the signals for tanks, pumps and valves, who responds to alarms, and what actions are linked. Confirm the supplied features from the equipment schedule and controls design.
