A building’s wastewater can vary during operation, cleaning and low-load periods. Identify the sampling point and operating conditions, and provide flow and receiving sewer information.
List confirmed and missing inputs separately. Specify additional sampling locations and times so the designer can establish pretreatment and process scope.
