Engineering scenario

Xiamen · Stainless steel tanks and plant-room layout

Verify effective volume, working levels, delivery clearances and the positions of all connections.

Stainless steel tanks and plant-room layout
Illustrative scene View full image

Checks and records

Operating conditions
Record the required working capacity, makeup conditions and minimum operating level.
Site coordination
Mark doors, columns, pipes, manhole direction and access in plan and set foundation, roof and invert elevations in section.
Commissioning
Put inlet, outlet, overflow, drain, vent and level points on the same drawing. Refer full-water loading to the structural team.