Planning outdoor water storage for Haicang logistics sites
Modern logistics is among the planned functions of Haicang Port Area. For an outdoor warehouse water tank, prepare information on access, foundations and exposure at the actual site.

What to prepare
- Equipment access
- Mark the gate, turning route and unloading point on the site plan. Identify lanes that need temporary closure during lifting and allow clearance above the tank and around the manhole.
- Foundations and drainage
- Provide foundation elevations, surface falls and nearby drain locations. Ask the project designer to check full-tank loads and anchorage, and confirm where overflow and drain water can discharge.
- Outdoor exposure
- Record the distance to the shore, direct exposure to sea winds and availability of wash water. Include the intended water use so materials and maintenance can be specified for the actual project.