Local engineering guide
Planning a campus booster pump room in Jimei
Jimei is home to university campuses. When teaching buildings and residences share a water system, record demand separately for each building type before planning pressure zones, maintenance access and the retrofit changeover.

What to prepare
- Demand and end-point pressure
- Record peak periods, served floors, the elevation of the critical outlet and its required pressure for teaching buildings and residences. Include operating pressure or alarm records if available.
- Plant room and noise
- Show plinths, drainage, power and the control panel on the drawings. Mark nearby classrooms, residences or offices and allow room for valve operation and pump replacement.
- Outages and handover
- Agree on affected buildings, outage windows, temporary water supply and the order of restoration with the campus team. Confirm which pressure readings and standby-pump checks will be recorded at handover.