Local engineering guide

Planning a campus booster pump room in Jimei

Jimei is home to university campuses. When teaching buildings and residences share a water system, record demand separately for each building type before planning pressure zones, maintenance access and the retrofit changeover.

Parallel booster pumps and a clear service aisle in a campus plant room
Engineering scenario

What to prepare

Demand and end-point pressure
Record peak periods, served floors, the elevation of the critical outlet and its required pressure for teaching buildings and residences. Include operating pressure or alarm records if available.
Plant room and noise
Show plinths, drainage, power and the control panel on the drawings. Mark nearby classrooms, residences or offices and allow room for valve operation and pump replacement.
Outages and handover
Agree on affected buildings, outage windows, temporary water supply and the order of restoration with the campus team. Confirm which pressure readings and standby-pump checks will be recorded at handover.