Local engineering guide

Planning a workshop water-system retrofit in Tong'an

The Tong'an industrial concentration area contains multiple manufacturing zones. Where a workshop retrofit affects process water, document the existing system and production continuity needs before selecting equipment and planning connections or changeover.

Existing workshop pipework, a flanged connection and a stainless steel buffer tank
Engineering scenario

What to prepare

Process water requirements
List actual water uses, demand by shift, peak flow and allowable interruptions. Describe connection requirements separately for process water, domestic water and other independent systems.
Existing pipework and access
Provide equipment nameplates, pipe sizes, valve locations, connection elevations and photographs. Measure doors, turns and lifting clearances, then plan the order of removal and delivery.
Changeover and commissioning
Agree which lines will switch first, whether temporary supply is needed and how to return to the original system if a problem occurs. Record operating flows, pressures and key valve positions at handover.

Xiamen environmental authority's published Tong'an industrial-area information