Local engineering guide
Planning a workshop water-system retrofit in Tong'an
The Tong'an industrial concentration area contains multiple manufacturing zones. Where a workshop retrofit affects process water, document the existing system and production continuity needs before selecting equipment and planning connections or changeover.

What to prepare
- Process water requirements
- List actual water uses, demand by shift, peak flow and allowable interruptions. Describe connection requirements separately for process water, domestic water and other independent systems.
- Existing pipework and access
- Provide equipment nameplates, pipe sizes, valve locations, connection elevations and photographs. Measure doors, turns and lifting clearances, then plan the order of removal and delivery.
- Changeover and commissioning
- Agree which lines will switch first, whether temporary supply is needed and how to return to the original system if a problem occurs. Record operating flows, pressures and key valve positions at handover.