Project preparation
- Inputs
- Combine static lift, terminal pressure, pipe and fitting losses, allowing for available inlet pressure.
- Coordination
- Plot normal and peak duty on the pump curve. Check operating range, input power and suction conditions.
- Handover
- Record water temperature and inlet pressure. For sewage pumps, add solids, fibres, sump levels and lifting access.
