Project preparation
- Inputs
- Record the required working capacity, makeup conditions and minimum operating level.
- Coordination
- Mark doors, columns, pipes, manhole direction and access in plan and set foundation, roof and invert elevations in section.
- Handover
- Put inlet, outlet, overflow, drain, vent and level points on the same drawing. Refer full-water loading to the structural team.