Solutions

Stainless steel tanks and plant-room layout

Verify effective volume, working levels, delivery clearances and the positions of all connections.

Stainless steel tanks and plant-room layout
Illustrative scene

Project preparation

Inputs
Record the required working capacity, makeup conditions and minimum operating level.
Coordination
Mark doors, columns, pipes, manhole direction and access in plan and set foundation, roof and invert elevations in section.
Handover
Put inlet, outlet, overflow, drain, vent and level points on the same drawing. Refer full-water loading to the structural team.