Project questions
How should tank maintenance be planned?
Agree with the site manager on the outage scope, isolation points, temporary water supply and drainage, then schedule the work and assign staff.
What should be recorded after cleaning?
Record the date, work area, condition before and after the work, restoration requirements and outstanding defects.
Before requesting a quote
- Operating conditions
- Inspect water level, overflow, leakage, deformation, fixings and drainage.
- Installation and access
- Agree the isolation, drainage and working area with management. Confined-space work requires qualified staff.
- What to confirm
- Record return-to-service conditions, defects, completion times and follow-up inspections.