Products

Water pressure boosting

Review inlet conditions, demand, pressure and controls.

Water pressure boosting
Illustrative scene

Sizing inputs and standards

Duty point
Provide design flow (m³/h), minimum inlet pressure and required terminal pressure. Include elevation and pipe losses in pump head and deduct available inlet pressure head.
Sizing example
At 10 m³/h, a 20 m elevation rise, 5 m loss, 15 m terminal head and 10 m available inlet head require a 30 m pump duty head. Check pump curves, efficiency and standby changeover at that point.
Materials, connections and configuration
Confirm pump casing, impeller, manifold and seal materials. List flow and head per pump, duty and standby count, connection DN, valves, variable speed panel, pressure sensors and low-water protection.
Reference standards
Check GB 55020-2021 for building water supply. For non-negative pipe system booster equipment, also check GB/T 26003-2010 and the inlet connection conditions.

Project questions

What should I provide before retrofitting a pump room?

Provide the pump nameplate, current piping drawing, inlet and outlet pressure and operating flow. Note when faults or pressure fluctuations occur.

Should I consider standby pumps and pressure zones?

Define operating and standby needs based on water supply continuity, outage impact and building zones. Ask the project team to confirm them.

Before requesting a quote

Operating conditions
Combine static lift, terminal pressure, pipe and fitting losses, allowing for available inlet pressure.
Installation and access
Plot normal and peak duty on the pump curve. Check operating range, input power and suction conditions.
What to confirm
Record water temperature and inlet pressure. For sewage pumps, add solids, fibres, sump levels and lifting access.