Potable water tank model and specification
- Lanbo HYBX potable water tank
- SUS304 stainless steel. The permit lists 1–2,000 m³ for potable water storage. Confirm usable storage separately using the approved operating levels.
Dimensions, materials and connections
- Pressed panel sizes
- Full panels measure 1 × 1 m and half panels 1 × 0.5 m. Use a 0.5 m planning grid for rectangular and L-shaped tanks. Confirm external and internal clear dimensions separately.
- Comparing 304 and 316L
- Use 304 as a starting point for ordinary storage. For higher chloride concentrations or special water quality requirements, assess 316L against water temperature, cleaning agents, weld conditions and operation. Confirm the ordered grade on approved drawings and material certificates.
- Plate thickness
- The historical 304 quote tool offers 1.0, 1.2, 1.5, 2.0, 2.5 and 3.0 mm. Specify the base, each wall course and roof separately. Confirm plate and reinforcement sizes through project structural review.
- Usable storage
- For a constant cross-section, multiply the clear plan area by the difference between the highest and lowest operating water levels, then subtract displacement within that band. A 4 m × 3 m internal rectangle with a 1.5 m working depth yields 18 m³ before deductions.
- Connections and accessories
- Confirm inlet, outlet, overflow, drain and vent connections. Itemize level gauges, manholes, ladders, bracing, base supports and insulation in the supply schedule. Size atmospheric tank connections for design flow and elevations. Verify pump operating pressure separately.
- Design and material references
- Check GB 55020-2021 for building water supply and drainage. Consult GB/T 3280-2015 for ordering and verifying cold-rolled stainless steel sheet. Include the applicable project standards, agreed equipment schedule and connection drawing with the inquiry.
Project questions
How is tank capacity verified?
Provide the required usable capacity and operating levels. If you only have external dimensions, use the sizing tool for an initial estimate and send the result to the project team for review.
How are inlet and drain openings agreed?
Put the purpose, diameter, elevation and direction on the same connection drawing. Agree on the drawing before cutting the openings or coordinating installation.
Before requesting a quote
- Operating conditions
- Record the required working capacity, makeup conditions and minimum operating level.
- Installation and access
- Mark doors, columns, pipes, manhole direction and access in plan and set foundation, roof and invert elevations in section.
- What to confirm
- Put inlet, outlet, overflow, drain, vent and level points on the same drawing. Refer full-water loading to the structural team.