Engineering scenario
Cangzhou · Plant-room and process valve replacement
Record valve duties, pressure class, face-to-face dimensions and controls before scheduling isolation.

Checks and records
- Operating conditions
- Tag each valve on the piping drawing and list service, medium, temperature, pressures and flow direction.
- Site coordination
- Check nominal diameter, pressure class, flange drilling, face-to-face length and stem clearance.
- Commissioning
- Record actuation, power, position feedback and failure position. Confirm differential pressure and control range with the design team.