Engineering scenario
Shijiazhuang · Plant room and workshop ventilation
Gather airflow, medium and system resistance data, then review duct layout and maintenance access.

Checks and records
- Operating conditions
- Record airflow, gas temperature, density and static or total pressure at the same duty point.
- Site coordination
- Mark filters, dampers, bends and transitions. Record the damper positions and measurement points during commissioning.
- Commissioning
- Provide the fan curve, duty point, power, noise and service clearances. Review smoke extraction and special media separately.