Project preparation
- Inputs
- Tag each valve on the piping drawing and list service, medium, temperature, pressures and flow direction.
- Coordination
- Check nominal diameter, pressure class, flange drilling, face-to-face length and stem clearance.
- Handover
- Record actuation, power, position feedback and failure position. Confirm differential pressure and control range with the design team.
