Engineering scenario

Zhoukou · Building water supply and pressure zoning

Check peak flow, required terminal pressure and the duty and standby conditions in each pressure zone.

Building water supply and pressure zoning
Illustrative scene View full image

Checks and records

Operating conditions
Combine static lift, terminal pressure, pipe and fitting losses, allowing for available inlet pressure.
Site coordination
Plot normal and peak duty on the pump curve. Check operating range, input power and suction conditions.
Commissioning
Record water temperature and inlet pressure. For sewage pumps, add solids, fibres, sump levels and lifting access.