On 8 September 2003, damage to an external cable cut both power feeds to Hangzhou’s Jiuxi Waterworks, stopping its output pumps and reducing pressure in parts of Zhijiang and western Hangzhou. The utility activated its emergency plan and tracked falling clear-water storage at Miaopu station. The power company sent a mobile generator and located the cable break for repair.
Engineering takeaway Check whether the two feeds share a vulnerable route and document which equipment the backup supply can support.
