Tianjin’s water authorities reported that diverted Yellow River water had passed the Xihe sluice into the Hai River. Plants were preparing equipment for a source switch once the intake met water-quality and level conditions.
Engineering takeaway Set out intake conditions, equipment readiness, testing milestones and dispatch responsibilities in a source-switch plan.
