Xinhua reported that Yingde opened its temporary line late on December 21 and delivered backup water to households early on December 22. The reported capacity of the line was 48,000 cubic metres a day.
Engineering takeaway Check the backup source, connection points and bypass capacity, and plan verification at user outlets after the switch.
