Tianjin’s Nankai District began upgrades to 331 residential booster installations in 2007, including pressure testing, pipe surveys and design. Depending on the site, the plan called for full or partial renewal, added disinfection, or booster equipment and pipe upgrades for seven- and eight-storey buildings with insufficient pressure.
Engineering takeaway Survey domestic and fire-water systems, operating pressures and tank maintenance access.
Source Enorth
