Lanbo Water Tanks
← Water infrastructure daily

Beijing moves into peak summer water supply operations

Clear-water basins and outlet valves at a Beijing waterworks in summer
Illustrative scene

Supply resilience ·

Beijing Water Authority carried a report on peak urban output rising to 3.3 million cubic metres a day. The utility entered summer operating mode after advance maintenance and clear-water tank cleaning.

Engineering takeaway Check standby equipment, usable storage and repair coverage before peak demand.

Source Beijing Water Authority website