Taizhou's water engineering office reported activating its standby intake to feed the city's No. 2 plant while a railway project required a raw-water main to be relocated. Staff tested the station and arranged standby generation before use.
Engineering takeaway A standby intake plan should verify pump start and stop conditions, backup power and monitoring at the receiving water plant.
