In 2025, urban Wuxi upgraded 182 booster facilities and retired 718 rooftop tanks on multi-storey housing, reaching more than 160,000 households across the programmes. Jiangda Ercun kept its existing pipes, replaced the rooftop tanks with an integrated pressure control unit and installed remotely monitored water-quality equipment.
Engineering takeaway Before retiring a rooftop tank, verify the replacement supply path, pressure and isolation points and identify abandoned pipes.
Source Wuxi Municipal Government
