Economic Daily reported that Huaibei was upgrading ageing booster facilities by area. The control centre already received live data from more than 100 pump rooms and could operate access controls and adjust pressure remotely. The report used Xiangshe Huadu’s former basement pump room to illustrate older problems, including connected domestic and fire networks, ageing equipment and no drainage.
Engineering takeaway Commissioning central monitoring should reconcile live equipment state, pressure trends and platform alarms, with a clear means for technicians to access each site.
