Engineering scenario
Nanjing · Stainless steel tanks and plant-room layout
Verify effective volume, working levels, delivery clearances and the positions of all connections.

Checks and records
- Operating conditions
- Record the required working capacity, makeup conditions and minimum operating level.
- Site coordination
- Mark doors, columns, pipes, manhole direction and access in plan and set foundation, roof and invert elevations in section.
- Commissioning
- Put inlet, outlet, overflow, drain, vent and level points on the same drawing. Refer full-water loading to the structural team.