Engineering scenario
Wuxi · Industrial storage and process makeup water
List normal and peak demand by shift and separate process, domestic and reuse connections.

Checks and records
- Operating conditions
- List demand by process, shift and common or peak flow, including cleaning.
- Site coordination
- Tag makeup, reuse, drain and circulation interfaces, and have the design team check separation and backflow.
- Commissioning
- Record the actual duty, spare interfaces and expansion limits for each handover phase.