Engineering scenario
Jinan · Water transfer across large elevation changes
Use consistent elevations and verify minimum and maximum pressure, working points and protective actions.

Checks and records
- Operating conditions
- Combine static lift, terminal pressure, pipe and fitting losses, allowing for available inlet pressure.
- Site coordination
- Plot normal and peak duty on the pump curve. Check operating range, input power and suction conditions.
- Commissioning
- Record water temperature and inlet pressure. For sewage pumps, add solids, fibres, sump levels and lifting access.