
Engineering guide · Equipment illustration
Fan duty and duct resistance
Record airflow, gas temperature, density and static or total pressure at the same duty point.
Read guideEngineering guides
Confirm operating conditions before selection, verify foundations, connections and access before delivery, and retain measurements, control points and handover records.

Plant-room and process valve replacement

Engineering guide · Equipment illustration
Record airflow, gas temperature, density and static or total pressure at the same duty point.
Read guide
Engineering guide · Equipment illustration
Tag each valve on the piping drawing and list service, medium, temperature, pressures and flow direction.
Read guide
Engineering guide · Equipment illustration
List sinks, dishwashers, floor drains and washdown times to establish peak greasy flow.
Read guide
Engineering guide · Equipment illustration
Record flow and discharge timing by source and production cycle. Keep original sampling records.
Read guide
Engineering guide · Equipment illustration
Combine static lift, terminal pressure, pipe and fitting losses, allowing for available inlet pressure.
Read guide
Engineering guide · Equipment illustration
Put inlet, stop, start, alarm and overflow elevations on one section drawing.
Read guide
Engineering guide · Equipment illustration
List demand by process, shift and common or peak flow, including cleaning.
Read guide
Engineering guide · Equipment illustration
Identify equipment exposed to low temperatures, wind, rain, condensation, standing water or salt spray.
Read guide
Engineering guide · Equipment illustration
Separate vendor documents, construction records, design revisions and third-party tests.
Read guide
Project guide
Record the required working capacity, makeup conditions and minimum operating level.
Read guide
Project guide
Record existing equipment labels, connections, pressure, flow and times of recurring problems.
Read guide
Project guide
Inspect water level, overflow, leakage, deformation, fixings and drainage.
Read guide
Project guide
Verify whether diameters are inside or outside and whether lengths are straight or measured along the centreline.
Read guide
Project guide
Survey the old tank, base, ports, access and dismantling routes.
Read guide
Project guide
Record medium, temperature, moisture and corrosive or cleaning exposure.
Read guideDescribe the location, intended use and available installation space. Have drawings or photos ready for the discussion.